ANA · F
Cutter Gauthier
ProbableLATEST DOCUMENTEDGRAPHICS ≠ BUILD
Last confirmed: 2026-09-18
First seen: 2026-09-18
VISIBLE GRAPHIC
Tacks Recharge Pro
CCM
BEHIND
THE
GRAPHICS
→
LIKELY UNDERLYING BUILD
Ribcor Trigger 10 Pro
LOW KICK
Construction is based on documented evidence, independently of the visible graphics.
Graphic cross-check · 2026-10-20: the visible model above matches
GearGeek’s player record ↗. This is a graphic-only update. StickDNA’s researched build, specifications, confidence and dates remain unchanged. The stick timeline below retains the original recorded graphics and dates.
STICK DNA
Latest documented spec
- Visible graphic
- CCM Tacks Recharge Pro
- Likely construction
- CCM Ribcor Trigger 10 Pro
- Build code
- Unknown
- Kick point
- LOW
- Flex
- 80
- True curve / mold
- P90
- Curve family
- P92 / Sakic family
- Closest retail stick
- Unknown
- Retail curve match
- P92 · Exact
- Lie
- 6.5
- Length
- Unknown
- Shaft
- Unknown
- Blade
- Unknown
- Grip
- Unknown
- First seen
- 2026-09-18
- Last confirmed
- 2026-09-18
Curve match: Exact canonical P92-family geometry match. CCM P90 normalizes to Bauer P92; the printed manufacturer lie number is not used as a cross-brand geometry measurement.
Explore P90 curve DNA →
EVIDENCE SUMMARY
Why we believe it
StickDNA publishes the evidence classification and conclusion while retaining source links, photos and raw research artifacts privately.
other
Matt current stick update — Cutter Gauthier — CCM Ribcor Trigger 10 Pro — 80 flex — P90
Evidence date: 2026-09-18
STICK TIMELINE
What changed — and what we actually know.
Visible graphics and true constructions are tracked separately. A historical graphics change can appear here while the build underneath remains unknown.
LATEST
2026-09-18 → 2026-09-18CCM Tacks XF Ghost → CCM Ribcor Trigger 10 Pro
LOW kick · 80 flex
ProbableRECENT
2025-09-29 → 2026-09-08CCM Tacks XF Ghost → Underlying build unknown
Graphics history only — StickDNA has not established the construction underneath.
UnknownStickDNA rule: A graphics change is a trigger to investigate, not proof of a construction change. Source publication dates and actual on-ice usage dates are tracked separately; a recent article about an older physical stick does not make that stick current.